PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Duct work leakage test at the 2nd floor Facing North.jpg Connecting copper piping to the 2nd floor VAV boxes Facing East.jpg Installed sheathing at Room 151 Facing South.jpg Laying out block at 1st floor Locker Rooms Facing North.jpg Poured concrete at the Boiler-Electrical Room Facing West.jpg
Next page Duct work leakage test at the 2nd floor Facing North
Duct work leakage test at the 2nd floor Facing North